This stage describes the activities associated with, handover of the built asset including updating ‘as constructed’ information, commissioning, and training. All information necessary for Soft Landings activities should be completed and the employer briefed and or trained in their operational requirements as per the contract.
During this stage the structured information prescribed in the Employers Information Requirements (EIR) and created during the evolution of the Project Information Model (PIM) shall be transmitted to the Asset Information Model (AIM) in the required formats such as COBie and proprietary geometric models.
It is important that the “as-constructed” models be verified for completeness including laser scan surveys and point-cloud analysis.
The data requirements of the handover process and associated activities are documented in PAS1192-3.
Handover and Close out
Tasks
Handover and Close out
Templates
Handover and Close out
Standards
-
PAS 1192-5:2015:
Specification for security-minded building information modelling, digital b... -
BS 1192:2007 + A2:2016:
Collaborative production of architectural, engineering and construction inf... -
PAS 1192-2:2013:
Specification for information management for the capital/delivery phase of... -
PAS 1192-3:2014:
Specification for information management for the operational phase of asset... -
BS 1192-4:2014:
Collaborative production of information. Fulfilling employer’s information... -
BS 8536-1:2015:
Briefing for design and construction. Code of practice for facilities manag... -
BS 8536-2:2016:
Briefing for design and construction. Code of practice for asset management... -
PAS 1192-6:2018:
Specification for collaborative sharing and use of structured Health and Sa... -
Read more about Standards