Model Status
Construction Model
What the model can be relied upon for
An accurate record of the asset as a constructed at handover, including all information required for operation and maintenance
Output
As constructed systems, operation and maintenance information Agreed Final Account Building Log Book Information gathered as key elements are completed to feed installation information for the later packages
Parametric information
Updated: Geometry and installed product information, "as constructed" Accuracy/ resolution of information. Commissioned performance for: Opex, energy, and carbon Detailed maintenance methodology Snagging actions status
Project costs
Final account
Handover and Close out
Tasks
Handover and Close out
Standards
-
PAS 1192-5:2015:
Specification for security-minded building information modelling, digital b... -
BS 1192:2007 + A2:2016:
Collaborative production of architectural, engineering and construction inf... -
PAS 1192-2:2013:
Specification for information management for the capital/delivery phase of... -
PAS 1192-3:2014:
Specification for information management for the operational phase of asset... -
BS 1192-4:2014:
Collaborative production of information. Fulfilling employer’s information... -
BS 8536-1:2015:
Briefing for design and construction. Code of practice for facilities manag... -
BS 8536-2:2016:
Briefing for design and construction. Code of practice for asset management... -
PAS 1192-6:2018:
Specification for collaborative sharing and use of structured Health and Sa... -
Read more about Standards